Large loss is its own discipline — tens of thousands of square feet, multiple buildings, or extended timelines residential firms can't scale to. Logistics, equipment fleets, crew coordination, and adjuster relationships at scale. We've worked Harvey, Beryl, and every Houston catastrophe since 2007.
Sprinkler / pipe failure floor-wide
30+ unit residential cascade
Hurricane portfolio response
100,000+ sq ft scope
Pre-positioned crews
Within 24 hours
100+ dehumidifier capability
Million-dollar scope handling
(713) 482-7161. Senior commercial dispatcher assigned. Loss scale assessed within 5 minutes.
Pre-staged equipment fleet activated. Crew teams of 20-50+ technicians assigned. Site command center planned.
Site command center established. Material flow scheduled. Crew rotation planned. Documentation at scale begins.
Large losses get senior adjuster assignment. We work directly at that level. Daily executive-level reporting begins.
Demo, drying, treatment, and rebuild scoping run in parallel. Multi-property coordination if portfolio. Stakeholder reporting daily.
Comprehensive documentation: physical damage + BI + tenant impact + portfolio coordination. Million-dollar+ scope final.
Since 2007 we've served Houston large-loss water damage across every catastrophe event. Harvey, Beryl, Imelda, Ike — multi-month catastrophe responses are our discipline.
Large loss claims involve commercial property insurance with significant business interruption components. Senior adjusters with million-dollar+ scope authority handle these losses. Our documentation framework supports both physical damage and BI claims with rigor that scales to the loss size.
Master service agreements with major commercial carriers exist. Pre-negotiated rates, expedited senior adjuster assignment, established working relationships. Important for catastrophe events when normal adjuster channels are overwhelmed.
Property + BI + Tenant policies coordinated simultaneously
Master service agreements available for portfolio properties. Commercial coverage typically includes both property and BI scopes.
Free on-site senior triage + scope documentation. Catastrophe-team consultation.
Multi-carrier billing for property + BI + contents. Senior adjuster coordination.
Catastrophe-event pre-negotiated terms. Portfolio rates for major commercial property owners.
"Hurricane Beryl damaged 8 of our commercial properties. They mobilized 60+ technicians across our portfolio simultaneously. Senior adjusters at each carrier coordinated through their command center. Closed all 8 properties within 4 months."
"Sprinkler system catastrophic discharge flooded 80,000 sq ft warehouse. Catastrophe team mobilized within 24 hours. Industrial drying equipment fleet ran for 6 weeks. Property + BI claim totaled $2.1M, closed in 5 months."
"Harvey damaged 14 of our Houston retail locations. They were our preferred large-loss vendor. Documentation across all 14 properties, coordinated senior adjusters, BI calculations standardized. Saved us months of claim time."
Generally $250K+ scope, multi-floor, or multi-building. Threshold varies by carrier. Senior adjuster assignment usually triggers at this level. Catastrophe-team mobilization is for $1M+ scope events.
Up to 50+ technicians within 24 hours. Equipment fleet scaling within 48 hours. Site command center within 72 hours. Catastrophe events require larger lead time but we pre-position during named storms.
Yes. We have direct working relationships with major commercial carriers (Chubb, Travelers, AIG, Liberty Mutual, FM Global, Zurich). Senior adjuster contacts established.
Yes. We pre-position crews and equipment during named storm warnings. Multi-property catastrophe response is our discipline. Harvey, Beryl, Imelda — months of multi-property work.
Yes. Major Houston commercial property owners and REITs use us as preferred large-loss vendor. Standardized documentation across properties. Single command center coordinates portfolio response.
Yes. Foreign-parent corporations with Houston operations use us regularly. We coordinate with international risk managers and meet international corporate documentation standards.
Multi-floor, multi-building, multi-property, CAT event — 50+ technician scaling, industrial equipment fleet, senior adjuster direct.